You are here:    Home » Products » Traditional Range » Installation Guide

Traditional Range

Traditional Installation Guide

Half Round, Victorian Ogee & 5x4 Moulded Ogee

Detailed installation instructions are supplied with each consignment. Also available on request.

Traditional Systems Installation

Step 1

1. To set the recommended gutter height ensure the gutter front is 10mm below the pitch of roof.

Step 2

2. Fix fascia brackets with 32mm x Nr10 Roundhead stainless steel screws Code SC201. Drill pilot holes for each fixing screw.

Step 3

3. Fix fascia brackets at 915mm centres, either nominally level, or to a falls of 1:600


Step 4

4. Support outlets and angles by fixing fascia brackets a maximum of 150mm from each side.

Step 5

5. Apply two 8mm dia beads of sealant central to the gutter socket. Do not carry out jointing in wet conditions, or temperatures below 4 deg C and above 40 deg C

Step 6

6. Finger tighten nut and bolt only, pull the joint apart sideways to ensure a minimum 3mm expansion gap is achieved. Then tighten one full turn only. Point sealant into joint gap adding sealant if required. Clean off any excess with Solvent cleaner SC108.


NB: Jointing should not be carried out in wet weather, temperatures below 5°C or above 40°C