traditional installation
  1. To set recommended gutter height, lay a straight batton on the lowest profile of the roof covering. The gutter bracket can then be offered up to the intersection point (10mm below the pitch of roof, as shown).
  2. Fix fascia brackets with 32mm x No10 roundhead screw, SC201. Drilling pilot holes first is recommended.
  3. Fix fascia brackets at 915mm centres, either nominally level, or to a fall of 1:600.
  4. Support outlets and angles by fixing fascia brackets a maximum of 150mm from each side.
  5. Place gutters into the fascia brackets, pressing down to engage into the brackets. Do not slide the gutter into the fascia brackets from one end.
  6. Clean all joint surfaces using clean cloth and solvent cleaner, SC108.
  7. Apply two 8mm thick parallel beads of sealant, SC101 central to the gutter socket and around the bolt hole. Do not carry out joining in wet conditions, or temperatures below 5°C and above 40°C.
  8. Nuts and washers can be located inside or outside the gutter. Bolt heads outside will appear neater, but the internally projecting thread and nut will have a minor effect on the flow performance. Both options are shown.
  9. Finger tighten nut and bolt only, pull the joint apart sideways to ensure a minimum 3mm expansion gap is achieved. Then tighten one full turn only with spanner/screwdriver. Point sealant onto joint gap adding additional sealant if required. Clean off any excess with solvent cleaner, SC108.
*
-